Most Shared

LOCAL 12 - Search Results

The following is an archived video story. The text content of that video story is available below for reference. The original video has been deleted and is no longer available.

Revive The Drive Weekend Projects for August 9th

Revive The Drive northern KY projects for the weekend of August 9, 2013:

I-275 road and bridge repairs between Exit 83 (US 25- Dixie Highway) and Exit 84 (I-75 and I-275 interchange

Starting at 8pm on Friday, August 9th: Entrance ramp from Donaldson Rd (KY 236) to east and west bound I-275 will be closed. Entry to I-75N will be maintained.

DETOUR FOR I-275: Traffic is to enter I-75N and take exit 186 at Buttermilk Pike (KY 391).  Proceed north on Buttermilk Pike to enter I-75S on the left.  Traffic will then proceed south on I-75 to the interchange with both directions on I-275.

Starting at 8pm on Friday, August 9th: The exit 185 west ramp from I-75N to I-275W will be closed.

DETOUR FOR EXIT 185: Traffic on I-75N will be directed to enter I-275E and take exit 83 at Dixie Highway (US 25).  Then proceed north on Dixie Highway and enter I-275W on the left.

All ramp restrictions are expected to end by 5am on Monday, August 12th.

Please exercise caution and reduce speeds in the work zone.  Watch for traffic control devices and personnel entering and exiting the work zone.

 

 

Talkers

Advertise with us!
Advertise with us!